Page 25 - Trends-by-DELABIE_n03
P. 25

/// DESIGN TROTTER / Le Havre  —  France                                               Le Havre  —  France / DESIGN TROTTER ///













 What's "Nouvel"

 in
 LE HAVRE?



                                                                         PORT OF CALL AT BAINS DES DOCKS
 BAINS DES DOCKS                                                         In  2008, the Ateliers  Jean  Nouvel  won  the
 LE HAVRE (FRANCE)                                                       contract  for the renewal  of the port  of  Le
 ATELIERS JEAN NOUVEL
                                                                         Havre, along with the creation of an innovative
                                                                         swimming  pool  complex.  A  project  to  match
                                                                         the size of the site:  8,600m 2  of usable space,
                                                                         sheltered behind a dark façade which masks the
                                                                         purity and originality of the interior.

                                                                         Three  main  spaces  are  spread  around  a
                                                                         central  lobby:  a  heated  outdoor  Olympic-sized
                                                                         swimming pool measuring 50 by 21 meters; an
                                                                         indoor-outdoor  leisure  pool;  and  a  spa  center.
                                                                         A  combination  of modern  and  natural,  the
                                                                         architecture  is  inspired  by natural  rock  pools
 24                                                                      and  plays  on  a  raw  geometry,  with  alternating  25
                                                                         massive blocks and random openings. Overhead
                                                                         light enters through numerous wells, creating a
                                                                         soft mood, perfect for relaxation.

















                                                                         The SPORTING 2  shower panel  saves  80%
                                                                         in  water and  energy.  What's  less  is  more
                                                                         with  DELABIE:  it  also  provides  comfort  and
                                                                         versatility, and is easy to maintain.






 DELABIE products installed:
 SPORTING 2 time flow shower panel (Ref. 714700),
 TEMPOMATIC 4 wall-mounted electronic tap (Ref. 443406),
 TEMPOSOFT 2 wall-mounted basin tap (Ref. 741550)
 and several accessory ranges




 Photo credit: © Ateliers Jean Nouvel - Photography: Philippe Ruault
   20   21   22   23   24   25   26   27   28   29   30